Current job

Here is a display of current job

Job for GRTgaz in Quimper
Our new PD 250/120 rig achieve her second directional drilling in Finistère in Quimper. One crossing of 370 meters and one of 220 meters are to be achieve in the order to install a 200 mm steel pipe with a polyethylene coating. Obstacles are "Classified Wood Areas". For this job, the directional drilling was chosen for the purpose of the environment. Thanks to this method, either fauna or flora will be affected by the work.
Directional drilling in Vierzon for GRTgaz
Our company is starting the directional drilling under the Cher in Vierzon. We use the PD 50/33 rig. A 150mm steel pipe is to install. The approximatly lenght is 300 meters.